• Security notice: Ernie Ball staff will never send you a direct message about a prize or giveaway, and will never ask you to click a link to "claim" anything.
    If you receive a message like that - even from an account whose name looks official - do not click the link. Please report it using the Report link on the message so the moderators can act. A scam campaign impersonating admin accounts was blocked on 29 July 2026; those accounts are banned and their messages have been deleted.

Silo Machines Question maybe for Dudley???

Mick

Well-known member
Joined
Jul 21, 2004
Messages
1,405
Location
Germany
As you see in my signature I own a 11 year old Silo and the machines need to be changed so I decided to put the now factory installed (on newer silos) Schaller locking M6 ind in it.
BUT since I´m in germany and able to order directly from Schaller I need to know which height they have to be cause they offering a staggered set.

So shall I use the E A D G from the staggered set they offer, but since I need the

B +E string from the other set which height need they to be??? Like the E+A from the other side since the have the same distance to the nut?? :confused:

Thank you , Mick
 
Bump. And will the changeover from non lock to lock machines go w/out further difficulties.??

Anyone?
 
MickThe guys have been swamped and worked till the wee hours setting up the open house someone will get back to on monday for sure....Its a little hectic right now there are 200 people decending on us now and we are crazy
 
Big Poppa said:
MickThe guys have been swamped and worked till the wee hours setting up the open house someone will get back to on monday for sure....Its a little hectic right now there are 200 people decending on us now and we are crazy

thanks, then what the heck are you doing here!!! :eek:
Get to work! ;) :p
 
Big Poppa said:
MickThe guys have been swamped and worked till the wee hours setting up the open house someone will get back to on monday for sure....Its a little hectic right now there are 200 people decending on us now and we are crazy


You mean 200 people are more important than my Silo problem.
I can´t f***** believe it , gimme the boss of this company ( wait till I can afford a real OLP then I get rid of my cheap Music Mans) ;)

And now get off the computer and drink with the guys.

Thanks BP, I´ll wait till monday or the day after the hangover :D
 
Mick said:
You mean 200 people are more important than my Silo problem.
I can´t f***** believe it , gimme the boss of this company ( wait till I can afford a real OLP then I get rid of my cheap Music Mans) ;)

And now get off the computer and drink with the guys.

Thanks BP, I´ll wait till monday or the day after the hangover :D


hehehhe :D :cool: :p
 
Oh man much traffic on this site after the open house.

Bump again . Anybody?
 
Back
Top