• Ernie Ball
  • MusicMan
  • Sterling by MusicMan

hankSRay

Well-known member
Joined
Aug 5, 2004
Messages
848
Location
Yonkers, NY
I tried a search but had no luck. How long is the order window for the 07 LE's? Is it the entire year or less?

Bongo Gas has struck so I'm trying to figure out a way to get one of those babies w/ out putting myself in credit card debt lol.

Thanks.
 

slucas

Well-known member
Joined
Apr 10, 2006
Messages
500
Location
IL
I tried a search but had no luck.

There was just a thread no more than 2 days ago in which this was dicussed. Probably June or maybe July will be last chance. No exact deadline has been set to my knowledge. I am considering a Bongo 4H myself but need to flip some stuff to get it. Or I could go ahead and get one anyway knowing intervention would be much needed:eek:
 

Dr Stankface

Well-known member
Joined
Apr 21, 2005
Messages
5,261
Location
Jacksonville, Florida
Bassmonkeee brought up the topic about having the Bongo 6 in blue dawn. I think BP stated they most likely will not be available. Sure would be cool but the guys at EB already do enough for us. :)
 

adouglas

Well-known member
Joined
Aug 12, 2005
Messages
5,592
Location
On the tail end of the bell curve in Connecticut
EBMM production, as we all know, runs some months behind the orders. So when you order in January, the actual production takes place in the June "bucket" (or whenever...depends on the size of the backlog).

My understanding is that when the December 07 production bucket fills up, that'll be it for 07 LE orders.

Since the size of the backlog determines when each bucket fills up, and since there's no way to precisely predict how many orders will come in how quickly, it's not possible to set a precise deadline.
 

phatduckk

Well-known member
Joined
Jul 25, 2004
Messages
8,145
Location
San Mateo, California, United States
My understanding is that when the December 07 production bucket fills up, that'll be it for 07 LE orders.

yup, thats my understanding as well. since production after an order takes ~5 months (maybe more) the order window is variable. so you can order up until the point that MM forecasts that the instrument will be built in 07.
 

slucas

Well-known member
Joined
Apr 10, 2006
Messages
500
Location
IL
Nothing wrong with pearl blue. I have an SR4HH and the abalone PG makes a smokin' color scheme.:cool: :cool: :cool:
 
Top Bottom