i just depends on how much back log there is at the factory.
EBMM only makes instruments after theyre ordered. So the lead time is variable. you're looking at a 3-6 month range. whether you're on the short or long end of that scale depends on the current # of orders.
every once in a while Dargin will give us a lead time estimate. I think last we heard it was around 5 months.